FlowMax sequences of operation
6 sequences for FlowMax equipment: what the unit does, step by step, with the timings. Pick the equipment type, then the mode.
Boiler (6)
Startup
- Switch-on and mode selection
FLOWMAX 90/120
Heating
- Heating call with restart delay and pump overrun
FLOWMAX 90/120
Domestic hot water
- DHW call with pump overrun and priority
FLOWMAX 90/120
Freeze protection
- Heating and DHW frost protection
FLOWMAX 90/120
Standby/shutdown
- Switched OFF at the control panel
FLOWMAX 90/120
Other
- Flue test and legionella functions
FLOWMAX 90/120
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.