Navien · Water heater troubleshooting

Installing the shut-off valve (optional accessory)

NWP500

What is going on

Optional valve that closes automatically when a leak is detected. Connector goes to the SHUT OFF connector inside the controller cover.

Check in this order

  1. Make sure power to the water heater is off.
  2. Mount the shut-off valve on the side of the unit (side installation).
  3. Remove the two screws from the lower heating element cover and take the cover off.
  4. Connect the valve's cable to the SHUT OFF connector inside the cover.
  5. After wiring, route the cable through the opening in the lower heating element cover and reinstall the cover.
  6. For top installation, connect the valve's connector to the SHUT OFF connector from the controller, install the front panel, and fasten it with the two screws at the bottom.

Applies to: NWP500-50, NWP500-65, NWP500-80

More water heater guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Navien NWP500 installation manual, p. 32. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.