Viessmann · Mini-split troubleshooting
Triple evacuation method
What is going on
Alternate evacuation method when it is followed exactly. Always break the vacuum with dry nitrogen.
Check in this order
- Pump the system down to 500 microns of mercury and keep the pump running for an additional 15 minutes.
- Close the service valves and shut off the vacuum pump.
- Connect a nitrogen cylinder and regulator. Open until system pressure is 2 psig.
- Close the service valve and let the system stand for 10 minutes so dry nitrogen can absorb moisture.
- Repeat the sequence as shown in the manual figure.
Applies to: System evacuation, all DLFSHC sizes
More mini-split guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: DLFSHC service manual, p. 9. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.