Viessmann · Mini-split troubleshooting
Check supply voltage on single-zone system before start-up
What is going on
Measure voltages at the outdoor disconnect, outdoor terminal block, and indoor unit, then record on the checklist.
Check in this order
- Turn off the main disconnect and lock it out before opening any panels.
- At the outdoor disconnect, measure 1(L1) to GND, 2(L2) to GND, and 1(L1) to 2(L2).
- At the outdoor terminal block, repeat the same three measurements.
- At the indoor unit, measure 1(L1) to GND, 2(L2) to GND, 1(L1) to 2(L2), and 2(L2) to 3(S).
- Record the readings on the start-up checklist.
Applies to: Single zone system
More mini-split guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: DLFSHC installation instructions, p. 20. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.