Plan access for the indoor unit before mounting it above a fixed ceiling.

Check in this order

  1. If the unit is above a fixed ceiling, install an access panel the length and width of the unit, or the blower and unit cannot be removed.
  2. For a single access panel, make the width the unit width plus 2 in on both sides.
  3. For a single access panel, make the length the unit length plus 18 in on the connection end and 2 in on the opposite end.
  4. Keep 18 in (46 cm) of service clearance at the service panel side as shown in the figure.

Applies to: Indoor units, all sizes

More mini-split guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Viessmann vitocal_ind_dlfsda_hk_tdm Technical Data Manual, p. 8. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.