Evacuate and charge system with vacuum pump
What is going on
Evacuate all circuits at once through the low side master service valve charge port. Break vacuum with dry nitrogen only. Factory charge in the outdoor unit covers line length up to 25 ft (8 m). Note: all units except the 18,000 BTU model have a master suction and liquid line service valve.
Check in this order
- Tighten the flare nuts (A, B, C, D, E) fully.
- Fully open all circuit service valves.
- Connect the manifold gauge charge hose to the charge port of the low side master service valve.
- Connect the other charge hose to the vacuum pump.
- Fully open the low side of the manifold gauge.
- Start the vacuum pump and evacuate using the triple evacuation method.
- When evacuation is complete, fully close the low side of the gauge manifold and stop the pump.
- Disconnect the charge hose from the low side service valve charge connection.
- Tighten the service valve caps securely.
Applies to: System evacuation and charging, all DLFSHC sizes
More mini-split guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: DLFSHC service manual, p. 9. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.