Viessmann · Mini-split troubleshooting
Drilling the wall hole for piping, drain and wiring
What is going on
Route the piping, drain and wiring through a wall hole with a slight downward slope, and keep the flare and drain connections on the outside of the wall for service access.
Check in this order
- Decide the pipe hole position so the flare and drain connections sit on the outside wall.
- Drill the pipe hole so the outside hole is 1/2 in. (13 mm) lower than the inside hole, giving a slight downward slant.
- Seal the hole after the cables and tubing pass through, otherwise space temperature swings can occur.
Applies to: All sizes
More mini-split guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: DLFSFA and DLFLFA installation instructions, p. 8-9. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.