Viessmann · Mini-split troubleshooting

Drilling the wall hole for piping, drain and wiring

Vitocal IND-F

What is going on

Route the piping, drain and wiring through a wall hole with a slight downward slope, and keep the flare and drain connections on the outside of the wall for service access.

Check in this order

  1. Decide the pipe hole position so the flare and drain connections sit on the outside wall.
  2. Drill the pipe hole so the outside hole is 1/2 in. (13 mm) lower than the inside hole, giving a slight downward slant.
  3. Seal the hole after the cables and tubing pass through, otherwise space temperature swings can occur.

Applies to: All sizes

More mini-split guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: DLFSFA and DLFLFA installation instructions, p. 8-9. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.