Viessmann · Heat pump troubleshooting
Repositioning the junction box to the left or right side
What is going on
The junction box is factory-mounted at the front and can be moved to the left or right side to suit the installation. Work is done inside the unit housing.
Check in this order
- Remove the display panel and the access panels for the side you are working on.
- Disconnect the display cable from the upper front access panel, since that panel moves with the junction box.
- Remove the four junction box retaining screws and set them aside.
- Turn the junction box to the desired orientation (left or right) inside the housing.
- Secure the junction box with the four retaining screws.
- Route the display cable to the display mounting location and reconnect it.
- Reinstall the access panels.
Applies to: Vitocal 100-WA
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: vitocal_100-wa_ap1t_ios.pdf, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.