Viessmann · Heat pump troubleshooting

Mounting on a curb

Vitocal 100-AW AM2V

What is going on

Use a field-supplied curb bracket with a gravel bed for condensate.

Check in this order

  1. Slide two mounting bolts into each channel of the curb bracket.
  2. Line up the mounting screws with the retaining tabs on the unit.
  3. Set the unit over the bolts and secure it.
  4. Keep a gravel bed under the unit to absorb condensate.
  5. Add a concrete foundation if required, and confirm condensate drains freely.

Applies to: Curb installation

More heat pump guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocal 100-AW AM2V Installation, Service and Operating Instructions, p. 39. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.