Weil-McLain · Heat pump troubleshooting
Installer-built (fabricated) manifold requirements
What is going on
If the WM Easy-Up manifold is not used, an installer-built manifold must meet these rules: at least 2 inches of vertical distance from the closely spaced tees to the first elbow on the heat pump piping (heat trap); a Y-strainer with an 80 mesh screen, mounted flow-down or horizontal; the heat pump circulator from the accessory box with its internal check valve fitted before the circulator is installed; common system piping of 1 inch or larger.
Check in this order
- Keep at least 2 inches of vertical run from the closely spaced tees to the first change of direction on the heat pump inlet/outlet piping.
- Install the Y-strainer with an 80 mesh screen, oriented flow-down or horizontal, to protect the heat pump heat exchanger.
- Fit the internal flow check valve into the heat pump circulator before mounting the circulator, and follow the circulator maker's guidelines.
- Use 1 inch or larger pipe for the common system piping.
Applies to: Heat pump installer-built manifold
More heat pump guides
Related
Weil-McLain error codes · Weil-McLain parts · Weil-McLain tips · Calculators and reference tables
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: ECO HP Heat Pump – Application Guide, p. 8. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.