Viessmann · Heat pump troubleshooting
Evacuate and charge the refrigerant system
What is going on
Deep vacuum procedure with triple evacuation. Use a vacuum pump that reaches 500 microns and a gauge that reads accurately at that level. Never use the compressor as a vacuum pump.
Check in this order
- Tighten all flare nuts fully and connect the manifold charge hose to the low side service port.
- Connect the other charge hose to the vacuum pump.
- Fully open the low side of the manifold gauge.
- Start the pump and evacuate to 500 microns, then run it 15 more minutes.
- Close the service valves and shut off the pump.
- Break the vacuum with dry nitrogen to 2 psig, then hold 10 minutes so the nitrogen absorbs moisture.
- Repeat the evacuation and nitrogen steps as shown in the triple evacuation chart.
- After the final evacuation, fully close the low side gauge and stop the pump.
- Add refrigerant per Table 10 if line length is over 25 ft (8 m).
- Disconnect the charge hose from the low side port.
- Fully open service valves B and A.
- Tighten all service valve caps.
Applies to: DLCSRB outdoor units, all sizes
More heat pump guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: DLCSRB Service Manual, p. 17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.