Viessmann · Mini-split · Other

Vacuum pump evacuation (triple evacuation method)

Vitocal IND-O

What happens, in order

  1. Tighten all flare nuts. Fully open all circuit service valves.
  2. Connect the manifold charge hose to the low side master service valve charge port.
  3. Connect the charge hose to the vacuum pump and fully open the low side of the manifold.
  4. Pump the system down to 1500 microns. Keep the pump running 15 more minutes.
  5. Close the service valves and shut off the pump.
  6. Connect dry nitrogen, break the vacuum to 2 psig, then close the valve and let it stand for 1 hour.
  7. Pump down to 1000 microns.
  8. Break the vacuum with dry nitrogen to 2 psig.
  9. Pump down to 500 microns and perform a 30 minute hold test.
  10. After evacuation, close the manifold low side, stop the pump, disconnect the hose, fully open service valves B then A, and tighten the caps.

Timings and thresholds

ItemValue
Pump-down hold after 1500 microns15 minutes
Nitrogen stand time1 hour
Final hold test at 500 microns30 minutes

Applies to: Refrigerant circuit evacuation

Models

DLFSOAH09XAKDLFSOAH18XAK

More Viessmann mini-split sequences

Take it to the job

Sequences of operation, error codes and tips work offline in the HVACopedia app.

Open the app

Source: DLFSOAH Service Manual, p. 6-7. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.