Viessmann · Mini-split · Other
Vacuum pump evacuation (triple evacuation method)
What happens, in order
- Tighten all flare nuts. Fully open all circuit service valves.
- Connect the manifold charge hose to the low side master service valve charge port.
- Connect the charge hose to the vacuum pump and fully open the low side of the manifold.
- Pump the system down to 1500 microns. Keep the pump running 15 more minutes.
- Close the service valves and shut off the pump.
- Connect dry nitrogen, break the vacuum to 2 psig, then close the valve and let it stand for 1 hour.
- Pump down to 1000 microns.
- Break the vacuum with dry nitrogen to 2 psig.
- Pump down to 500 microns and perform a 30 minute hold test.
- After evacuation, close the manifold low side, stop the pump, disconnect the hose, fully open service valves B then A, and tighten the caps.
Timings and thresholds
| Item | Value |
|---|---|
| Pump-down hold after 1500 microns | 15 minutes |
| Nitrogen stand time | 1 hour |
| Final hold test at 500 microns | 30 minutes |
Applies to: Refrigerant circuit evacuation
Models
DLFSOAH09XAKDLFSOAH18XAK
More Viessmann mini-split sequences
- Indoor fan delayed open on start · Startup
- Test operation after gas leak and electrical checks · Startup
- Indoor fan running in COOLING mode · Cooling
- FAN mode operation · Other
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: DLFSOAH Service Manual, p. 6-7. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.