Viessmann · Mini-split · Startup
Test operation after gas leak and electrical checks
What happens, in order
- Press ON/OFF on the remote control to start the test.
- Press MODE and cycle through COOLING, HEATING and FAN to confirm each function works.
Timings and thresholds
| Item | Value |
|---|---|
| Protection delay before the unit can start after power-up | approximately 3 to 4 minutes |
Applies to: DLFSCBH / DLFLCBH, sizes 24-48
Models
24XAK36XAK48XAK
More Viessmann mini-split sequences
- Indoor fan delayed open on start · Startup
- Indoor fan running in COOLING mode · Cooling
- FAN mode operation · Other
- Vacuum pump evacuation (triple evacuation method) · Other
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: DLFSCBH and DLFLCBH installation instructions, p. 15. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.