Daikin · Furnace · Other
Full set-up sequence
What happens, in order
- Step 1 - Communication.
- Step 2 - Personalization.
- Step 3 - Equipment Set-up.
- Step 4 - System Optimization.
- Step 5 - Preferences.
- Review all steps before finishing set-up so the system is configured and ready for the homeowner.
Applies to: Daikin One+ full set-up
More Daikin furnace sequences
Related
Take it to the job
Sequences of operation, error codes and tips work offline in the HVACopedia app.
Source: Daikin One+ Smart Thermostat Installation & Commissioning, p. 23. Written in our own words; timings can differ by model and software version, so check the manual for your exact unit.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.