Wiring for DHW priority in system layout 4
What is going on
Wiring diagram for system layout 4. Power is supplied through a disconnect and overload protection. DHW priority is set through the Honeywell relays and aquastat.
Check in this order
- Provide a disconnect and overload protection on the power supply as required by code.
- For DHW priority, wire the DHW aquastat (120 VAC) to the boiler/burner control unit.
- If DHW priority is not needed, power terminals L1 and L2 of the RA889A relay for heating circuit E.
- Use 120 V field wiring for pumps and 24 V field wiring for the control signals as shown on the diagram.
Applies to: Vitodens 100-W WB1B 26 and 35, system layout 4
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 100-W, WB1B installation manual, p. 42. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.