Water side piping (Hydrostat 3250-Plus)

Vitorond 100VR1

What is going on

Closed loop forced circulation systems only. Flush the system before connecting the boiler, because sludge can settle in the boiler and cause overheating and failure. This failure is not covered by warranty.

Check in this order

  1. Flush the heating system thoroughly, especially older systems.
  2. Remove the top back panel screw and the top back panel before connecting pipe fittings.
  3. Connect the system supply to connection A and the system return to connection C with NPT fittings.
  4. Install a spring-loaded flow-check valve in heating circuits without mixing valves to stop gravity circulation in summer.
  5. Install the temperature and pressure gauge with brass extension coupling in the 1/2 in. opening, using Loctite or Teflon tape.
  6. Check supply and return piping for restrictions where air could be trapped, and provide air vents in the system supply.

Applies to: Hydrostat 3250-Plus water side

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitorond 100 VR1 installation and service manual, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.