Viessmann · Boiler troubleshooting
Wall mounting the boiler bracket and CombiPLUS on studs
What is going on
Mount the boiler bracket and CombiPLUS kit level on wall studs, with fixings centred in each stud. Wood and metal studs need different fixings.
Check in this order
- Hold the mounting bracket and CombiPLUS against the wall as shown in the illustration.
- On wood studs, drill 3/16 in pilot holes in the centre of each stud and secure with mounting bolts.
- On metal studs, drill the pilot holes in the centre of each stud (the pilot hole size is not legible in the manual), then fix with suitable fasteners you supply.
- Confirm both the bracket and CombiPLUS are secured before hanging the boiler.
Applies to: Wall mounting, wood and metal studs
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 100-W WB1B installation manual, p. 16. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.