Viessmann · Boiler troubleshooting
Wall mounting on concrete and studs
What is going on
Use the enclosed screws and rawl plugs only on concrete. Other materials need bolts and anchors rated for 220 lb (100 kg). On concrete, drill 12 mm holes, install rawl plugs, and screw the bracket on level. On wood studs, drill 3/16 in. pilot holes at the center of each stud. On metal studs, use the supplied fasteners (the pilot hole size is unreadable in this copy). A cross bar or frame may be needed. The wall and studs must carry at least 220 lb (100 kg). Secure the bracket tightly, since loose mounting is a severe hazard.
Check in this order
- Drill 12 mm holes into concrete for the rawl plugs.
- Install rawl plugs and screw the bracket to the wall.
- Check that the bracket is level.
- On wood studs, drill 3/16 in. pilot holes at the stud center and secure with bolts.
- On metal studs, use the supplied fasteners and check the bracket is level.
- Add a cross bar or frame if the studs need reinforcement.
- Confirm the wall and bracket are rated for 220 lb (100 kg) and tightened fully.
Applies to: Vitodens 200-W B2HA 80 to 100, 285 to 352
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 200-W B2HA installation instructions, p. 13-14. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.