Wall mounting bracket on concrete, wood and metal studs

Vitodens 100-W B1HE/B1KE

What is going on

The boiler mounts on a wall bracket. The supplied screws and rawl plugs are only for concrete. Other materials need bolts and anchors rated for 196 lb (86 kg). A loose bracket is a severe safety hazard, so it must be tight and level.

Likely causes

  • Bracket not fully secured
  • Wall material not suitable for the supplied fixings

Check in this order

  1. Check the wall condition and confirm it can carry 196 lb (86 kg).
  2. Concrete mark the holes, drill 10 mm holes, insert the rawl plugs, and fasten the bracket with the supplied screws.
  3. Wood studs drill 3/16 in. pilot holes at the center of each stud and fasten with bolts.
  4. Metal studs drill pilot holes at the center of each stud, use the supplied fasteners, and make sure the bracket is level.
  5. Check the bracket is tight and secure before hanging the boiler.

Applies to: Vitodens 100-W B1HE and B1KE wall-mounted

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitodens 100-W B1HE/B1KE installation manual, p. 13-14. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.