Viessmann · Boiler troubleshooting
Wall mount boiler on bracket (B2HB 19, 26, 35, 68, 94, 125)
What is going on
Mount the boiler to the wall bracket with the boiler held level so condensate drains correctly. Bracket must be fastened tightly to the wall.
Check in this order
- Make sure the wall bracket is tightly and securely fastened to the wall.
- Remove the external accessories connection box cover.
- Loosen the bottom boiler screws without removing them.
- Lift the front enclosure panel up and pull it away from the boiler.
- Hang the boiler on the bracket and confirm it is secure, then connect to the installation fittings.
- Check that the boiler is level both vertically and horizontally.
Applies to: B2HB 19, 26, 35, 68, 94, 125
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitodens 200-W B2HB technical data manual, p. 16. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.