Viessmann · Boiler troubleshooting
Wall and frame mounting of the boiler
What is going on
Free-standing or wall-mounted install using the boiler stand or wall bracket. No mounting template is supplied, so the wall positions for the frame, bracket and vents must be calculated in the field.
Check in this order
- Fasten the boiler stand securely to the floor. Viessmann recommends concrete expansion anchors (Hilti KB-TZ, size partly garbled in the manual).
- Fasten the wall mounting bracket, supplied with the boiler, to the mounting frame with the supplied hardware. Keep the bracket level.
- Move the frame into position and secure it to the floor, and to the wall if needed.
- Remove the external accessories connection box cover.
- Loosen the bottom boiler screws without removing them.
- Remove the front enclosure panel by lifting it up and pulling it away from the boiler.
- Hang the boiler on the mounting bracket and make sure it is secure. Fit the holding bracket to the frame over the top of the boiler.
- Adjust the levelling screws until the boiler is level.
- Connect the boiler to the installation fittings.
Applies to: Vitodens 200-W B2HA 45, 60
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 16-17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.