Viessmann · Boiler troubleshooting

Vent termination location requirements - USA

Vitocrossal 200 CI2

What is going on

Vent must follow local rules plus ANSI Z223.1 or NFPA 54. Flexible vent is only for vertical runs. Key limits: not less than 7 ft (2.13 m) above a paved walk or driveway on public property; 4 ft (1.2 m) horizontally from service regulator vents, electric and gas meters, and relief equipment; 3 ft (0.9 m) above any forced air inlet within 10 ft (3 m); 1 ft (0.3 m) above grade or snow level; 1 ft (0.3 m) from a window, door, or non-mechanical air inlet; 3 ft (0.9 m) from an inside corner of outside walls.

Check in this order

  1. Confirm the vent does not end inside any listed clearance.
  2. Keep the termination away from planters, patios, and windows where flue gas causes fogging.
  3. Keep flue gas away from brick, siding, or other surfaces that can be damaged by heat or condensate.
  4. Keep the termination 3 ft (0.9 m) from the property line where possible.

Applies to: Vent termination, USA

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocrossal 200 CI2 Installation Instructions, p. 51. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.