Start-up procedure overview
What is going on
Start-up is done in this order: 1 controls and indicators; 2 check the fixed high limit; 3 integrate the control in the LON BUS (with heating circuits downstream); 4 carry out the participant check; 5 match the control unit to the system type; 6 check outputs (actuators) and sensors; 7 match the coding addresses.
Check in this order
- Go through the controls and indicators.
- Check the fixed high limit.
- Integrate the control in the LON BUS if used.
- Carry out the participant check.
- Match the control unit to the system type.
- Check outputs (actuators) and sensors.
- Match the coding addresses.
Applies to: Vitotronic 100 GC1 boiler control start-up
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 100 GC1 installation and service instructions, p. 84. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.