Slab curing (screed drying) function
What is going on
Used to dry a new concrete floor slab with a controlled supply temperature profile. Set F1 to 1 to 4 for profile 1 to 4. Profiles run over 30 days with supply temperatures up to about 50 °C.
Check in this order
- Set coding F1 to the required profile (1 to 4).
- Follow the slab curing supplier's instructions and local regulations.
- Record heat-up data with the supply temperatures, the maximum supply temperature reached, and the operating condition and outdoor temperature at handover.
- Expect the function to continue after power failure or after the control unit is switched off.
- Heating program restarts after screed drying finishes, or if the address is set manually to 0.
Applies to: Mixing valve circuit, screed drying
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocontrol-S, VD2/CT3/CM2 Installation and Service Instructions, p. 180 and 183. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.