Viessmann · Boiler troubleshooting
Side piping installation - gas line and water pipes
What is going on
Route the flexible factory gas line to the chosen side and connect the water pipes through the side cutouts.
Check in this order
- Remove the tie-wrap holding the factory gas line.
- Bend the flexible gas line at its middle toward the desired side, without kinking it.
- Secure the gas line to the centre restraining ring.
- Fit O-rings over the male boiler fittings and check they are seated in the groove.
- Slide the insulation sleeve over the DHW pipe.
- Pass the pipes through the side cutouts of the boiler.
- Line up the pipes with the boiler fittings and push from the top until snug.
- Secure the pipe ends into the correct restraining rings.
- Fit the supplied locking clips over the bottom boiler connection and pipes.
- Fit security clips to the DHW pipe retaining clips.
Applies to: Vitodens 222-F, B2TB side piping
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 222-F, B2TB installation instructions, p. 27. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.