Viessmann · Boiler troubleshooting
Setting the boiler sequence at the cascade control unit
What is going on
The boiler sequence depends on the cascade coding and internal control calculations. An ECO threshold can block or release each boiler based on outdoor temperature. The lead boiler always stays in operation if all boilers would otherwise be blocked.
Check in this order
- From the home screen tap Menu.
- Tap Boiler sequence.
- Select the required sequence and confirm with OK.
Applies to: Cascade (lead boiler) control unit
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 300, GW6B installation and service instructions, p. 52. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.