Viessmann · Boiler troubleshooting

Setting a central heating time program

Vitocrossal 300 CU3A

What is going on

Time phases define when rooms heat to standard temperature. Between phases the rooms run at the reduced temperature. Up to 4 phases per day are possible. Each phase has a start and end point, shown as a white bar on the time chart. Example: Mon-Fri with phase 1 at 05:00 to 08:30 h and phase 2 at 16:30 to 23:00 h.

Check in this order

  1. Open the extended menu.
  2. Select Heating, then the required heating circuit.
  3. Select Heating time program.
  4. Select the part of the week or a single day.
  5. Select time phase 1 to 4.
  6. Set the start and end points for the phase.
  7. Press the exit button to leave the menu.

Applies to: Central heating heating circuits

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Viessmann Vitocrossal 300 CU3A operating instructions, p. 18. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.