Viessmann · Boiler troubleshooting
Setting a central heating time program
What is going on
Time phases define when rooms heat to standard temperature. Between phases the rooms run at the reduced temperature. Up to 4 phases per day are possible. Each phase has a start and end point, shown as a white bar on the time chart. Example: Mon-Fri with phase 1 at 05:00 to 08:30 h and phase 2 at 16:30 to 23:00 h.
Check in this order
- Open the extended menu.
- Select Heating, then the required heating circuit.
- Select Heating time program.
- Select the part of the week or a single day.
- Select time phase 1 to 4.
- Set the start and end points for the phase.
- Press the exit button to leave the menu.
Applies to: Central heating heating circuits
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitocrossal 300 CU3A operating instructions, p. 18. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.