Viessmann · Boiler troubleshooting

Set central heating time program

Vitocontrol-S

What is going on

Set the on and off times for central heating phases 1 to 4. Use 1-7 for identical days or a day name for a single day.

Check in this order

  1. Open the hinged cover and select the heating circuit.
  2. Press the central heating time program key. The central heating time program display appears.
  3. Press up/down until 1-7 (all days) or a single day shows, then confirm.
  4. Confirm to start time phase 1. Skip a phase with the skip key.
  5. Set the start time for phase 1 with up/down and confirm.
  6. Set the finish time for phase 1 with up/down and confirm.
  7. Repeat for phases 2 to 4.
  8. After the finish time of phase 4 is confirmed, the boiler sequence shows. Close the cover.

Applies to: Vitocontrol-S, VD2/CT3/CM2

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocontrol-S, VD2/CT3/CM2 operating instructions, p. 16. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.