Viessmann · Boiler troubleshooting
Set central heating time program
What is going on
Set the on and off times for central heating phases 1 to 4. Use 1-7 for identical days or a day name for a single day.
Check in this order
- Open the hinged cover and select the heating circuit.
- Press the central heating time program key. The central heating time program display appears.
- Press up/down until 1-7 (all days) or a single day shows, then confirm.
- Confirm to start time phase 1. Skip a phase with the skip key.
- Set the start time for phase 1 with up/down and confirm.
- Set the finish time for phase 1 with up/down and confirm.
- Repeat for phases 2 to 4.
- After the finish time of phase 4 is confirmed, the boiler sequence shows. Close the cover.
Applies to: Vitocontrol-S, VD2/CT3/CM2
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocontrol-S, VD2/CT3/CM2 operating instructions, p. 16. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.