Viessmann · Boiler troubleshooting
Set a time program for central heating, DHW or DHW recirculation
What is going on
Time programs are set at the system and lead boiler section control. Up to 4 time phases can be set per day, and each day of the week can be different. Outside the time phases, the system heats to the reduced temperature.
Check in this order
- From the home screen, open the heating circuit (for example Heating circuit 1).
- Open Time program heating, then select the day (for example Mo).
- Set the start and end points of time phase 1, then time phase 2 and so on, up to 4 phases.
- Confirm the settings.
- To copy a day's program, select the target days after the source day and confirm.
- To change a phase, select it and adjust its start or end point, then confirm.
- To delete a phase, select it and confirm the deletion.
Applies to: Vitocrossal 300 CA3B Series 2.5 to 6.0
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 300 CA3B operating instructions, p. 19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.