Viessmann · Boiler troubleshooting

Route cables and mount the CM2 control and junction box

Vitocontrol-S CM2

What is going on

Installing the CM2 control and its junction box on the control panel and rear panel.

Check in this order

  1. Route cables and capillaries from the control through the opening in the control panel.
  2. Guide the cables to the junction box through the rear panel opening and along the top rail to the control.
  3. Secure all cables to the rail with cable ties.
  4. Insert the capillaries into the sensor well.
  5. Keep cables away from hot metal components.
  6. Mount the control to the control panel and secure it with screws. The screws are supplied with the cosmetic cover in the boiler jacketing package.
  7. Install the junction box on the rear panel, right or left, and secure it with 4 x 4.8 metal screws.
  8. The ground screw and ground wire can be removed and refitted with the boiler back panel attached.

Applies to: Vitocontrol-S CM2 on boiler control panel

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitotronic 100 GC1 / Vitocontrol-S VD2/CT3/CM2 installation manual, p. 70. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.