What is going on
Installing the CM2 control and its junction box on the control panel and rear panel.
Check in this order
- Route cables and capillaries from the control through the opening in the control panel.
- Guide the cables to the junction box through the rear panel opening and along the top rail to the control.
- Secure all cables to the rail with cable ties.
- Insert the capillaries into the sensor well.
- Keep cables away from hot metal components.
- Mount the control to the control panel and secure it with screws. The screws are supplied with the cosmetic cover in the boiler jacketing package.
- Install the junction box on the rear panel, right or left, and secure it with 4 x 4.8 metal screws.
- The ground screw and ground wire can be removed and refitted with the boiler back panel attached.
Applies to: Vitocontrol-S CM2 on boiler control panel
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 100 GC1 / Vitocontrol-S VD2/CT3/CM2 installation manual, p. 70. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.