Viessmann · Boiler troubleshooting
Route and secure connecting cables
What is going on
Cables must not exceed their rated temperature and must not touch hot components. Low-voltage, 120 V and DHW sensor leads are separated in the box.
Check in this order
- Keep cables clear of hot components so they are not damaged.
- Check that cable temperature ratings are not exceeded on site.
- For larger cables, remove the existing cable grommet and fit the cable grommet in the lower casing (black).
- Route all connecting cables to their areas (low voltage, 120 V, internal extension, main PCB, communication module, power cable grommet, DHW sensor plugs).
- Secure the cables to the control base using the existing strain reliefs.
Applies to: Vitodens 200-W B2HA 45, 60
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 24. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.