Viessmann · Boiler troubleshooting
Remove and reinstall the top back panel
What is going on
The top panel screw can make the panel hard to remove. Move the screw to a new hole to make removal easier.
Check in this order
- Move the top panel screw about 3 in. to the left or right of its original position.
- Pre-drill the panel with a 1/8 in. drill bit.
- To reinstall, drill a new 1/8 in. pilot hole through the top back panel and into the back panel.
- Reinstall screw P into the new hole.
Applies to: Vitorond 100 top back panel
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100, VR1 Installation and Service Instructions, p. 32. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.