Viessmann · Boiler troubleshooting

Reducing boiler height before placement

Vitocrossal 300 CA3B Dual Fuel

What is going on

Steps to lower the boiler height so it fits into the space. Panels, upper frame and burner can be removed.

Check in this order

  1. Disconnect power and close the gas shut-off valve before any burner work.
  2. Let the system cool before working on the burner.
  3. Remove the top panel screws (4 screws on 2.5-4.0; 6 screws on 5.0-6.0).
  4. Lift and remove the top right side panels, then slide the top panels toward the right and remove them.
  5. Lift and remove the top left side panels.
  6. Remove the nut and bolt on each side of the lower upper-frame profiles, then remove the upper frame profiles.
  7. Remove the top front panel.
  8. Remove the screws from the top rear panel and remove it.
  9. Reinstall the upper frame profiles and front and rear panels after positioning.

Applies to: CA3B Dual Fuel 2.5 to 6.0

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocrossal 300 CA3B Dual Fuel Series 2.5 to 6.0 installation instructions, p. 11-12. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.