Preparing the install and electrical work
What is going on
Electrical work must be done by a qualified electrician under local codes. Power and water must be off during installation.
Check in this order
- Turn off the power and water supply at the main panel before starting work.
- Use a qualified electrician for all wiring.
- Install circuit breakers or other means to disconnect the boiler from the power source.
- Flush all associated components (boiler, tubing, valves, manifolds) before installing the boiler.
- Check that the installation follows all applicable local codes.
Applies to: Vitotron 100 VLN2
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotron 100 installation and service instructions, p. 3. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.