Viessmann · Boiler troubleshooting
Preparing the boiler for burner service
What is going on
Removing top panels and upper frame profiles to access the burner. Screw count differs by model size.
Check in this order
- Make sure power is disconnected and the gas shut-off valve is closed.
- For 2.5 to 4.0: remove the 4 screws from the right side of the top panels. For 5.0 and 6.0: remove the 6 screws from the right side of the top panels.
- Lift and remove the top right side panels.
- Slide the top panels toward the right side and remove.
- Lift and remove the top left side panels.
- Remove the nut and bolt from each side of the lower portion of the upper frame profiles.
- Remove the upper frame profiles.
- After service, reinstall the upper frame profiles and panels.
- Work on the burner only when the system is cold; hot surfaces can cause burns.
Applies to: Vitocrossal 300 CA3B Dual Fuel 2.5 to 6.0
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 300 Dual Fuel CA3B service instructions, p. 51. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.