Pre-test checks before high limit safety cut-out test (CSD-1)
What is going on
Checks to make before testing the boiler high limit controls. Viessmann says the high limit is set at a fixed 210°F (99°C) and needs a manual reset after it trips.
Check in this order
- Check the heating system pressure. Operating range is 15 psi (1.0 bar) minimum to 80 psi (5.5 bar) maximum.
- For room air dependent operation, confirm the combustion air openings in the mechanical room are open.
- For room air independent direct vent operation, confirm the air pipes are unobstructed.
- Check the gas supply pressure against the target value in the table on page 24.
- Open the gas line shut-off valves.
- Check the neutralizing system, if installed, including the hydraulic seal in the condensate trap.
- Check all gaskets and plugs and retighten if needed.
- Check heating water side connections for leaks after about 500 hours of run time.
- Switch on the boiler power at the breaker, then power on the control unit.
Applies to: Vitocrossal 200 CI2 gas condensing boilers
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 Service Instructions, p. 10. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.