Confirm the system and boiler are ready before the first firing.

Check in this order

  1. Check that all turbulators are fully inserted into the flue gas passages with the combustion chamber door open.
  2. Confirm combustion and ventilation air openings in the mechanical room are open.
  3. Confirm the heating system is filled and fully purged of air.
  4. Check the cold fill pressure of the heating system.
  5. Check the oil supply or the natural or propane gas supply pressure.
  6. Confirm a barometric draft regulator is installed (field supplied).
  7. Confirm the clean-out openings near the flue gas collar are tightly closed.
  8. Confirm the water quality was tested and meets the system-fill guidelines.

Applies to: VD2-320 to VD2-1080

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitorond 200 VD2 installation manual, p. 36. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.