Positioning and levelling the boiler
What is going on
The boiler must sit on a load-bearing foundation that allows for a neutralisation system connection. Levelling feet must be used once the boiler is in its final position. Dimension b is 29 in. (750 mm) for all models without seismic feet, and 46 in. (1170 mm) with seismic feet.
Check in this order
- Place the boiler on its final load-bearing foundation.
- Using an open-end wrench, adjust the levelling feet in the base frame until the wheels are off the ground.
- Place a flat steel plate under each levelling bolt for better weight distribution.
- Level the boiler by adjusting the levelling feet.
Applies to: Vitocrossal 200 CI2 399 to 2000
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 installation instructions, p. 11. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.