Viessmann · Boiler troubleshooting
Mounting the wall bracket on wood or metal studs
What is going on
Studs must support 155 lb (72 kg). A cross bar or frame may be needed for reinforcement. The metal-stud pilot hole size is not legible in this copy.
Check in this order
- For wood studs, drill 3/16 in. pilot holes centred in each stud.
- Secure the bracket to the wood studs with bolts.
- For metal studs, drill pilot holes centred in each stud (size not legible in this copy) and use fasteners not supplied with the boiler.
- Confirm the bracket is level.
- Add a cross bar or frame if the studs need reinforcement.
Applies to: Vitodens 200-W B2HA 45, 60 wall mounting
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 13-14. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.