Viessmann · Boiler troubleshooting

Mounting the wall bracket on concrete

Vitodens 200-W B2HA

What is going on

The enclosed screws and rawlplugs are for concrete only. Other materials need fixings rated for 155 lb (72 kg).

Check in this order

  1. Drill holes 12 mm (31/64 in.) in the concrete wall.
  2. Install the rawlplugs and screw the mounting bracket to the wall.
  3. Confirm the bracket is level.
  4. Tighten the bracket fully so the boiler cannot loosen.

Applies to: Vitodens 200-W B2HA 45, 60 wall mounting

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitodens 200-W B2HA 45, 60 Installation Instructions, p. 13. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.