Viessmann · Boiler troubleshooting

Massachusetts installation requirements

Vitocrossal 300 CU3A

What is going on

Special requirements apply when installing in the Commonwealth of Massachusetts.

Check in this order

  1. Have a licensed plumber or gas fitter install the boiler.
  2. Keep any flexible connector to 36 inches or less.
  3. Use only tee-handle type shutoff valves where a level-type shutoff is used.

Applies to: Installations in Massachusetts

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitocrossal 300 CU3A application guide, p. 17. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.