Low water cut-off (LWCO) connection, VD2/VD2A/CT3
What is going on
Wiring of an external low water cut-off device. The factory jumper must be removed before the device is connected in series.
Check in this order
- Remove the jumper between terminals 12 and 15.
- Connect the LWCO device as shown in the diagram.
- Refer to the LWCO manual for its exact interconnection.
Applies to: VD2/VD2A/CT3 controls
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitotronic 300 GW2 installation and service instructions, p. 49. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.