Viessmann · Boiler troubleshooting
LON extension with on-site cable and junction boxes
What is going on
For extensions up to 900 m / 3000 ft using on-site cable. Up to 99 participants are allowed.
Check in this order
- Use Viessmann LON cable part no. 7143 495 between control units and junction boxes.
- Connect the on-site cable between junction boxes for runs up to 900 m / 3000 ft in total.
- Keep the number of participants, junction boxes and cables within the 99-participant limit.
- Confirm the cable meets the FTT-10A interface requirements (see www.echelon.com).
- Keep the two wires and shielding on every segment.
Applies to: Vitotronic 300-K MW1S LON system
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitotronic 100 GC1 / Vitotronic 300-K MW1S installation and service instructions, p. 69. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.