Viessmann · Boiler troubleshooting
Layout 3: hydraulic and electrical reference
What is going on
Example Layout 3 combines one unmixed heating circuit, two mixed heating circuits with 3-way mixing valves, DHW tank (dual mode) and optional solar DHW.
Check in this order
- Layout 3 hydraulic and wiring diagrams are not reproduced as readable text in these pages.
- Use the Layout 3 system description on page 40 with the approved local design.
- Add shut-off valves and safety equipment as required by local engineering.
Applies to: System Layout 3
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 300 CU3A 26 to 199 Service Instructions, p. 40. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.