Installing control and junction box (CM2)
What is going on
Route cables and capillaries from the control to the junction box and mount the control on the panel.
Check in this order
- Route cables and capillaries from the control through the opening in the control panel.
- Guide cables to the junction box through the rear panel opening and along the top rail to the control.
- Secure all cables to the rail with cable ties.
- Insert capillaries into the sensor well.
- Keep cables away from hot metal components.
- Mount the control to the control panel and secure it with screws (supplied with the cosmetic cover in the jacketing package).
- Mount the junction box to the rear panel on the right or left side with 4 x 4.8 metal screws.
- The ground screw and ground wire may be removed and reinstalled with the boiler back panel attached.
Applies to: CM2 control and junction box
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Viessmann Vitotronic 100 GC1 installation and service instructions, p. 39. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.