Viessmann · Boiler troubleshooting
Install pressure relief valve and high limit (Hydrostat 3250-Plus)
What is going on
Install the factory supplied pressure relief valve per its own instructions.
Check in this order
- Pipe the pressure relief valve to the boiler water supply connection as illustrated.
- Fit the discharge pipe to the valve, ending about 6 in. above a floor drain, unthreaded.
- Install the supplied high limit control (Hydrostat 3250-Plus) on the electro-well as shown.
- Set the high limit no higher than 240 F (110 C).
Applies to: Hydrostat 3250-Plus safety devices
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100 VR1 installation and service manual, p. 17. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.