Viessmann · Boiler troubleshooting

Hydrostatic pressure test after section assembly

Vitorond 200 VD2A

What is going on

Mandatory after assembly and before any other piping, controls or safety devices are connected to the pressure vessel.

Check in this order

  1. Blank off the main return with a 2½ in. NPT plug.
  2. Close the main supply and fit a pressure gauge (0-150 psig) and an automatic air vent on the safety header side. Use the supplied metric flanges with NPT couplings.
  3. Fill with room temperature water and bleed all air through the safety header vent.
  4. If city water pressure is low, use a hand pump on the boiler drain valve.
  5. Bring pressure to the test value and hold it for 30 minutes.
  6. Check top push nipple ports with a flashlight. Check bottom ports by sliding paper under the cast iron block.
  7. Release pressure slowly and carefully. Remove the test plugs after a successful test.

Applies to: Cast iron block after assembly

More boiler guides

Take it to the job

All guides, error codes and tips work offline in the HVACopedia app.

Open the app

Source: Vitorond 200, VD2A Series Installation, p. 21. Written in our own words; check the manual for your exact model.

For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.