Viessmann · Boiler troubleshooting
Hydrostatic leak test of the boiler
What is going on
Test before the boiler is connected to piping or power. Do not exceed 1-1/2 times the maximum operating pressure.
Check in this order
- After installing the safety devices, fit a temporary cap on the 3/4 in. pressure relief nipple.
- Cap the supply and return connections.
- Connect a 1/2 in. garden hose to the boiler drain valve and fill slowly until the gauge reads 68 psi (4.65 bar).
- Hold pressure for 15 minutes. Do not leave the boiler unattended.
- Check pipe joints, safety devices and boiler base for leaks with a flashlight.
- Release pressure slowly through the drain valve, remove the caps, and install the pressure relief valve.
Applies to: Vitorond 100 VR1 boilers
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitorond 100 VR1 installation and service manual, p. 22. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.