Viessmann · Boiler troubleshooting
Gas connection and piping
What is going on
Connect gas per the national or provincial fuel gas code and local rules. Size the pipe for the whole building, including all appliances.
Check in this order
- Close the gas shutoff valve on the boiler.
- Install a ground joint union, capped drip leg and manual shutoff valve before the boiler, using nationally listed valves.
- Make the boiler gas connection (3/4 in NPT).
- Support the piping so it does not rest on or hang from the boiler.
- Use moderate pipe dope and leave 2 threads bare.
- Carry out the gas piping leak test, then bleed air from the gas line.
- Label the shutoff valves and show the owner where they are.
Applies to: Gas supply piping to Vitodens 100-W WB1B
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitodens 100-W WB1B installation manual, p. 18-19. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.