Viessmann · Boiler troubleshooting
Gas connection and gas train
What is going on
A field-supplied service gas pressure regulator is required for all installations. Additional components may be required per local code (248-CMR-7:00, N.B.C., NFPA 54 and/or ANSI Z223.1). Gas shut-off valve size is 1 1/2 in. for models 399 to 1000 and 2 in. for models 1500 and 2000 (as printed, see notes). The gas train includes a built-in low gas pressure switch, electronic gas control valve, high gas pressure switch, test firing valve, direct spark ignition burner with venturi, and on 750/1000 a VPS pressure switch.
Check in this order
- Install a field-supplied gas shut-off valve upstream of the boiler.
- Install a field-supplied union on each side of the gas train as shown.
- Install a field-supplied service gas pressure regulator (required on all installations).
- Check gas shut-off valve size 1 1/2 in. for models 399 to 1000; 2 in. for models 1500 and 2000.
- Verify the built-in low and high gas pressure switches and the test firing valve are in place before firing.
Applies to: Vitocrossal 200 CI2 399 to 2000
More boiler guides
Take it to the job
All guides, error codes and tips work offline in the HVACopedia app.
Source: Vitocrossal 200 CI2 installation instructions, p. 15, p. 16. Written in our own words; check the manual for your exact model.
For licensed technicians. Gas, electrical and refrigerant work must be done by a qualified, licensed person. Shut off power and gas before servicing, never bypass a safety control, and follow the manufacturer’s manual for the exact model; it and local codes always take priority. HVACopedia is not affiliated with any manufacturer; brand and model names only identify the equipment.